Pwodwi
Cricket Stadium Lighting Design
Modular structure.
Easy to assemble stock 50W single module 100W-1000W
There are several angles available (60°, 90°, and 70°*145°).
very efficient up to 150 lm/w.
SMD5050 , 5 year guarantee.

Product Astract: A high level of efficiency up to 150 lm/w. Waterproof to IP66, 5 year guarantee. Offered in modules with a power rating of 50W, 100W, 150W, 200W, 240W, 300W, 400W, 500W, 600W, 800W, or 1000W. There are several beam angles, including symmetric 60°, 90°, and 70° x 1 beam angles.
Features:
- Modular structure.
- Easy to assemble stock 50W single module 100W-1000W
- There are several angles available (60°, 90°, and 70°*145°).
- very efficient up to 150 lm/w.
- SMD5050 , 5 year guarantee.
- The application circumstances are more varied, and several installation holes are provided.
- The screw hole on the U-shaped rotatable bracket allows the beam angle to be changed from 0° to 180°.
- IP66 is corrosion-resistant, waterproof, dust-proof, and explosion-proof.
- The entire set of fixtures has good heat dissipation, low temperature, and a long lifespan.
- Smaller and lighter packaging, cheaper freight, and more market competitiveness.
| Item NO. | BW-FL-1000W |
| Input Voltage | 100-265V AC |
| Wattage | 1000W |
| Luminous Flux | 150,000 Lumen |
| Luminous efficiency | 150LM/W |
| Lihgt Source | SMD 5050 |
| Dimension |
792mm*632mm*215mm |
| Weight | 19.6KG |
| Equivalent | 4000W HPS Equivalent |
| CCT | 2700K/3000K/ 4000K/ 5000K/ 5700K/ 6500K |
| Beam Angle | 60° / 90°/ 70° X145°/optional |
| Power Factor | >0.95 |
| Color Rendering Index | Ra70 (Ra80,Ra90 optional) |
| optical lens | PC lens (Optical Grade) |
| IP&IK Rating | IP66/IK08 |
| Certified | CE/ROSH/ISO9001 |
| Working Tempe / Humidity | -45 to + 50 Deg C / @Ta=25 Deg C |
| Warranty | 5 years Warranty |
| Rated Lifespan | 50,000+ hours |
Detailed Images:





Configuration:



FAQ
Q1.What kind of guarantee do your lights have?
A1: We provide a five-year guarantee on the lights.
Q2.How do you assure quality, exactly?
A2: Three QC procedures are provided: for raw materials, throughout the second part of manufacturing, and for the final QC test following a 12-hour age period.
Q3: What should I do if there are any quality issues throughout the warranty period?
A3: To begin, record a video or photo as proof and submit it to us. We'll give you brand-new ones for nothing.
4. Is OEM OR ODM acceptable?
A4: Yes, we provide OEM & ODM services. Both the light and the box may be customized with a branding.
Q5: How long will it take to complete the samples? What about the widespread production?
A5: Typically, samples are made within 5-7 days. The amount will determine the mass manufacturing lead time.
What trade assurance do you offer?
A6:100% preservation of product quality 100% protection against late deliveries 100% payment protection for the amount you have selected.
Baj popilè: cricket stadium lighting design, China, suppliers, manufacturers, factory, buy, price, best, cheap, for sale, in stock, free sample










